In the morning of the 21st of October 2010 concrete was being casted at the third floor of the B-Tower. The B-Tower, 70 meters high, was under construction at that time. When the work was nearly done, the floor of approximately 300 m2 collapsed and landed on the floor underneath. The five people working on the floor at that time crashed together with the collapsing floor and were severely injured.
Report not yet available in english